Lynfield College - Classroom Block

Thorough post-construction clean of a new classroom block at Lynfield College, delivering a safe and finished environment ahead of the school term.
Project Overview
New classroom block for Lynfield College, requiring a thorough post-construction clean prior to the commencement of the school term. The scope included all new classrooms, interior glazing, joinery, and finished surfaces.
Our Approach
HygieNZ performed a detailed interior clean focused on the removal of fine construction dust from joinery and finishing works, ensuring all surfaces, windows, and floors were brought to a presentation standard appropriate for a school environment.
- Detailed removal of fine dust from joinery and finishes
- Window and surface cleaning throughout
- Floor preparation for immediate use
- Safe and clean environment for students
Outcome
Classrooms were handed over clean, visually finished, and ready for immediate teaching use - with no delays to the school opening schedule.
Client

Lynfield College | Naylor Love
Project Details
Location
Auckland, New Zealand
Completed
2025-12-31
Services
"The level of detail in the final clean ensured a seamless delivery in time for the school opening."